Project Name: Equipm∏§ Ωent Purchase, Installation, and De☆<bugging Project for the Sludge Treat÷♦ment Engineering of the First and Second Sewage ✘σ®≈Treatment Plants in Suzh×₽∞&ou District, which is part of the 2017 Shanty&•town Renovation and Infrastructure Constructi ✘♣×on Project - Water Supply and Drainage Pipeli←±ne Laying and Renovation Project (Second £$™♠Bid Section) in Suzhou District.
Project Overview: The total scale o ©↕f the sludge treatment and disposal☆™γ↕ project is 120 tons per day, with a recent c×☆Ωonstruction scale of 80 tons pe♠∏>r day. Six sets of electro-osmotic ÷ φ"sludge drying treatment equipmen©©t are used to reduce the moistur →e content of the sludge from 80ε β&% to less than 60% t™δhrough electro-osmotic drying treatment, a♥λ✔nd then the sludge is landfilled.
The project started at the end of 2021 a£∞nd completed final acceptance in September 2022.
項目現(xiàn)場(chǎng)
電(diàn)滲透污泥幹化(huà)處理(lǐ)設備