Yangjiang Xinhuan Water ✔≠∏¥Service Co., Ltd. was established in 2010 as a h≠$olding enterprise of the groσ×↕up, with a total investment of 1₩≈30 million yuan and a registered capi÷εδtal of 40 million yuan. It σ§adopts the BOT method for in≥<→×vestment, construction, and o₩ε<peration. The four sewage tr€ ↓eatment plant projects₹₽Ω in Yangjiang City, including Gaoxin, Yβ✔inling, Chengnan Phase I, and Chengbei Phase↕'® I, have been in operation≥π< for 26 years, with a daily treatment capaφ£™city of 50000 tons.
The Yinling Sewage T₹ >reatment Plant (Phase®↔ I) project in Jiangcheng District is locate₽↑↑d in A15 District of Yinling Industrial Parkλ". The total investment of the project ∞↕is 26.0472 million yuan, and the treatment$×✘π process adopts an "A/A/O integraεted biochemical tank". The projec¥↔εt covers an area of 10950 squ♥±₩are meters and has a total design ≤₹scale of 50000 tons per™"≈ day. It will be constructed in thre✘↕×€e phases: the first phase will be 10000 to ✔ σns per day, the second <♦÷phase will be 20000 tons per day, γ•and the third phase will be 20000 to§ ↑ ns per day. The first phase of the project was o♠↕∑fficially put into operation on October 1, ★δ↔ 2013, with an operating p∏↔δeriod of 25 years. The scope of serv↔♦ices for the first p™≠↑hase of the project i$♦Ωncludes domestic sewage and industrial wasπ™πtewater from living supporting ar•↑eas such as Yinling In™ dustrial Park and surrounding residential ar∑¶eas.