The Yangjiang High tech Zone Lingang In'$dustrial Park Sewage Treatment Plan₩ ←&t Project Department was ∞¥established in 2018, ¥£ ✘representing the group to ∏€operate the Yangjiang High tech Zone Lingang In♦÷dustrial Park Sewage Tre↓♣ §atment Plant in a government commission↔↔ed manner for 5 years, with a daily<♠ processing capacity of 10000 tons.
The Yangjiang High tech Zone Lingan £g Industrial Park Sewage Tr ←¥eatment Plant (Phase I) is located south of the ±♦≈♦planned industrial park in Yangjiang H₩λ×igh tech Zone Lingang Industri↑<₩al Park, adjacent to the east side of the>↕φ♠ Sanya River. The treatment process of this p←'roject is the A/A/O microΩγ® aeration oxidation ditch process. The planned <land area of the project is a↓β↕"bout 4.2 hectares, with a total design scale of ≈€♥50000 tons/day. It will be construc♣∞ted in three phases: the first phase☆≈ will be 10000 tons/day, and the entrusted manage™₩ment and operation will official♠β↔↔ly begin on December 1, 2020. The e →ntrusted operation period is 5 years. Th"©£→e second phase is 20000 tons/day, and the thir→πd phase is 20000 tons/day. ↑×The scope of engineering services is mainly bo∏γunded by the planned Hai<∏ gang Yiheng Road in the north™ ∑, to the planned Haigang Siheng Road in the southγ☆, to the Hailing Bay Embankment in ≠×the west, and to the Sidun River in the east.→♠